送变电工程

includes electric power transmission and transformation engineering in the electric power system ranging from transmission lines、 substations and supporting facilities and distribution lines

project

electricity transfer and transformation of chiping xinfa

constructing company

xinfa group

equipping plan

220kv circuits and pressure-reducing station

working range

working drawings and completing drawing designing

period of project

2014

project introduction

the project has been put into use since october 2013. 5-kilometer 220kv circuits are designed and one transformer station of 220/110/10kv as a key project of electricity utilization of huaxing chemical industrial zone of huafa group.