we provide design, consultancy and epc services of generating sets and combined heat and power generating set equipped with medium temp. and medium pressure, high temp. and high pressure, super high pressure and subcritical and supercritical pressure.

project

5th stage dynamic technique improvement project of luxi chemical group co., ltd

constructing company

luxi chemical group co., ltd

equipping plan

two pulverized coal boilers of high temperature and high pressure at 680t/h and one b90mw back-pressure turbo generator

working range

feasibility study, primary designing, working drawings and completing drawing designing.

period of project

2014