火力工程
project overview
project: combined heat and power project of he bei xin xin yuan energy inc.
constructing company: he bei xin xin yuan energy inc.
equipping plan: one pulverized coal boiler of high temperature and high pressure at 150t/h and one cb30mw extraction-back-pressure turbo generator.
working range: feasibility study, primary designing, working drawings and completing drawing designing.
period of project: august 2014-march 2016
combined heat and power project of he bei xin xin yuan energy inc.is located in the petrochemical zone of bohai new district zongjie industry zone, cangzhou, hebei province. as a project to centrally supply heat with steam as the heat source for the petrochemical zone of bohai new district zongjie industry zone, 2 pulverized coal boilers of high temperature and high pressure at 150t/h and one cb30mw extraction-back-pressure turbo generator set are planned with one boiler and one generator at the first stage.
the project provides 492,9 million kwh/year by using limestone gypsum method and wet esp to desulfurize and scr to denitrate, therefore keeping pollutant so2 emission standard≤5mg/nm3, dust and soot standard ≤5mg/nm3、nox standard≤40mg/nm3
in this project, we use pulverized coal boilers of high temperature and high pressure at 150t/h of wuxi guanghua boiler inc, extraction-back-pressure turbo generators of hangzhou steam turbine inc and turbo generators at 30mw of shandong jinan generating equipment co., ltd. as our electricity generators