in december 2014, the company succeeded in winning the bmf heat supply project of shandong xinshengjia biomass energy inc. with the total amount of investment of 181 million yuan to build 2x45t/h circulating fluidized boilers with medium temperature and pressure and 2xc6mw turbo generators.
the company established swiftly an establishment team, charged by liu shaojiang from project management department and a design team mainly comprised of staff from thermal power and heat control design department.
on the basis of bilateral cooperation and positive communication, our company accomplished the whole project and got acceptance in december 2015 due to the professional design and high-efficient working capability.